Progress Report II (Pres)
Almambet Iskakov, Robert Pienta
12 00 AM ,Mon, Oct 26 2015
Quick Recap
Our pipeline is almost complete
We are now working on the final linking (steady state microstructures)
We have created a series of optimization and cross-validation (CV)
Previously we had 11 datasets
Now we have 18 datasets
Number of PCs (for 90% variance) increased to 5
Cross-Validation (CV)
To avoid overfitting we use leave-one-out CV
For each Leave-One-Out test, we measure
Goodness of fit:
Mean Squared Error (MSE)
Parameter Optimization
k-dimensional-grid parameter estimation using CV
Requires training each model hundreds of times
Finds approximately optimized parameters per model
Linear P-S Linkage
Linear Regression
Ridge (L2 Regression)
Lasso (L1 Regression)
Example Linear Model Coeffs
For the solidication velocity case:
General Performance
Ongoing Work
Explore transient datasets and create a time series model
Increasing the number of samples from a single simulation
Running an optimized version of each linkage model
Nonlinear models
2 Suspicious datasets
Non-Linear P-S Linkage
Our nonlinear modeling will be covered in subsequent blog posts
Linear SVR
-SVR
Forest
Random Forest
Questions & Comments
Print
Back